The framing stage is mandatory for any construction in Australia and is perhaps the most important phase, as it forms the skeleton of the building. Whether using timber or steel, Altez provides professional inspectors who can assess the framing stage and ensure it has been completed without major defects that could compromise the structure.
A building surveyor is typically required to attend the site for inspection under VBA regulations, but their focus may be limited to minor items such as fastener spacing, fastener type or incorrect timber grading and sizing. At Altez our inspection reports are highly valued and often recommended by carpenters as we always provide on-site solution and advice to the carpenters to rectify on the spot.
We maintain the highest professional standards and ensure that all building works are carried out in accordance with the engineering drawings and relevant Australian Standards such as AS 1684.
To perform a thorough inspection we need the full set of engineering drawings, including roof truss diagrams, bracing details and timber schedules. These documents, prepared by the structural engineer, form the basis of our assessment and allow us to verify that the framing meets the specified design requirements.
Get a free quote from Altez, submit the design and engineering drawings at admin@altezbuildinginspections.com.au